SCENZ-GRID Project Milestones

These milestones are the contracted milestones for the initial project phase. During this phase we expect to raise funds to for subsequent phases which will develop and implement specific workflows, probably using the Keplar workflow tool. The GEON LiDAR workflow is considered to be a prime candidate for early funding.

Milestone 1 - Achieved

30 Sep 2007 Milestone 1 : Report providing list of software to be used and hardware specifications for servers to be purchased.

The following tables represent our initial understanding and intentions, the master version of this document is held on the SCENZ-GRID's sakai collaboration space on the BestGrid server. The hardware sited is in intended to be sufficient for project members to experiment with and perform performance tests in order to scope a larger operational system.

Software in summary:
Software Component GEON SEEGRID SCENZ-GRID
Base OS:
Rocks / RedHat Enterprise LINUX y y y
Development:
Globus y y y
Web Services (jakarta-tomcat, axis, ant, jdk) y y y
GridSphere y - y
GeoServer - y y
Database:
Postgres y y y
PostGIS (Geos, Proj) y y y
ArcSDE, ArcIMS - - y
Resource Management:
SRB, IRODS y - y
OGSA-DAI y - y
GIS/Mapping:
Grass, GMT y -
ArcGIS - y y
Security:
Tripwire, chkrootkit y -
Kerebos, Shiboleth - y
System Monitoring:
INCA Testing & Monitoring framework (Teragrid) y y
Network Weather Service y y
Ganglia y y
Job Submission and Monitoring:
Condor, PBS y y

Hardware in summary:
Hardware Component Landcare GNS
KAREN access & internal Gbit/s infrastructure Lincoln & Palmerston North:
implemented July & Oct resp.
Hamilton:
scheduled late 2007 &
Auckland Tamaki:
No plans - dependant on Akl University’s Tamaki Campus Plan
Dunedin:
co-sited with GNS
Avalon:
schduled late 2007,
Dunedin:
scheduled early 2008
Hardware Node Architecture Dell or IBM Blades
& Sun StorageTek NAS
Dell PowerEdge 2970 or similar
with Dell MD1000 disk array as appropriate
Portal Node Single Dual-core Xeon 2.3GHz,
2GB Ram,
2x300GB 10K RPM SAS HDD
Single Dual-core 64bit CPU
(AMD or Intel), 2x300Gb
>=10K RPM SAS HDD
Data Node


NAS
Single Dual-core Xeon 2.3GHz,
2GB Ram,

Extension to existing hardware:
>2TB (6x300GB SATA II RAID-5)
Existing hardware
GIS Node Dual Quad-core Xeon 2.3GHz,
4GB Ram,
2x73GB 15K RPM SAS HDD
Single Dual-core 64bit CPU
(AMD or Intel), 2x300Gb
>=10K RPM SAS HDD
SCENZGRID Workstation Dual Mid Specification P4 Xeon,
4GB Ram,
300GB SATA HDD,
Nvidia Dual Head 512MB Graphics,
Dual 22” WXGA LCD
Existing hardware

Milestone 2

30 Apr 2008 Milestone 2: Hardware and software cited for Milestone 1 installed and tested.

Milestone 3

30 Sep 2008 Milestone 3: Report listing databases that have been ported to the new system

Milestone 4

31 Jan 2009 Milestone 4: Post workshop report provided to REANNZ.

-- RobertGibb - 02 Nov 2007